HS2
Our commercial engineers have helped with the build of HS2 throughout sections of the track from The Chilterns to Banbury.
CT Walters have been appointed to carry out electrical works to the works compounds at several locations along the 80km section of track being built by EKFB
At each location we have installed main power supply panels circa 1200amps connecting to temporary generators or a DNO provided supply
These power supplies are then distributed to site welfare facilities, car park lighting, EV chargers, wheel wash, water pumping stations etc
These works have been constructed as permanent installations as they will be in place for 5 to 10 years
We are also providing installations to smaller satellite compounds, water treatment plants and concrete batching plants
Location
Oxfordshire
Value
£1,000,000
Time
12 months