Corby Warehouse

Wise Logistics Solar Installation Project Details:

  • 96 x 440W Jinko N Type Solar Panels

  • 40 kWh Huawei Inverter

This system is delivering significant energy savings, with current savings of £500 per month. The expected payback period for the installation is just 3 years.

Client Review: "Absolutely amazed with the quality and professionalism. From the very first call up to the handover—top level!"

Location
Corby, Northamptonshire

Previous
Previous

Warehouse Lighting

Next
Next

St Michael's Church